Seawall and bulkhead planning for waterfront businesses

Get a plan for the seawall while accounting for boat slips, customer access, utilities and busy seasons.

Discuss a waterfront business project
01 · Operating needs

Tell us how the business uses the waterfront.

  • Shoreline sections, approximate lengths and any reports of movement, erosion or damage.
  • Slips, docks, shore power, fuel, water and other utilities in or near the work area.
  • Customer and staff routes, emergency access, accessible entrances and delivery needs.
  • Busy seasons, events, lease requirements and preferred dates for the work.
  • Boat movements, space for equipment and limits on access from the water.
Share the business’s needs
02 · Design questions

Check what the wall supports.

Show the engineer any docks, pavement, equipment and utilities connected to or near the wall. These can affect its design and repair cost. Get a project-specific assessment and budget for the commercial work.

Review assessment questions
03 · Approvals & phasing

Plan permits and business access together.

Ask the project team to list the permits needed and who will handle each application. Florida DEP’s application instructions explain the information needed for marina and shoreline projects.

Ask whether work can be done in stages. Plan temporary protection, any closures and changes to slips or utilities before the work begins.

Review permit starting points

Common questions

Can the business stay open during work?

It depends on the work and safe access. Tell the project team which operations need to continue and ask for a plan showing any closures or temporary changes.

Can repairs be scheduled outside peak season?

Share your preferred dates and peak season. Confirm the feasible work schedule with the project team before relying on a preferred date.

Are dock and utility changes included?

Ask for dock connections, electricity, water and fuel systems to be listed in the work description and price. Some systems may need a separate specialist.

Can I use a homeowner calculator for this budget?

It can help organize known prices and missing costs. For the marina’s budget, use prices based on its own design, equipment access, utilities and permit needs.

Who handles permits and operational approvals?

Ask the project team to list the local, state and federal permits needed and name who will handle each application.

Is emergency stabilization available?

If there is immediate danger, move people away and contact local emergency services. For movement, soil loss or serious wall damage, seek prompt help from a seawall professional.

Marina bulkheads: larger permits, more agencies

Commercial and multi-slip projects usually fall outside single-family exemptions. Fort Pierce requires Planning and Engineering pre-approval and Fire Department review for commercial docks. In aquatic preserves, dock length is limited to 500 feet or 20% of the waterbody width, whichever is less. Port St. Lucie’s 2020 Ordinance 20-52 set commercial seawall fees at $200 per 100 linear feet; confirm the current commercial schedule.

Checklist for Dock Permits · Fla. Admin. Code R. 18-20.004 - Management Policies, Standards, and Criteria · Ordinance 20-52 (Chapter 150 ordinance format final), Legistar File 2020-681

Local marina and bulkhead projects

Fort Pierce rebuilt its City Marina after Frances and Jeanne destroyed 140 slips, with a breakwater island system the city describes as FEMA-funded, costing more than $18 million. Martin County’s 96th Street bulkhead on the St. Lucie River drew a $1,012,835.85 low bid for about 210 feet in 2024. Stuart awarded a $2,674,713 contract in 2026 to replace its downtown courtesy dock.

Environmental Stewardship Award Narrative - The Fort Pierce City Marina · Supplemental Memorandum, Contracts That Meet the Threshold for Board Approval $1 Million or Greater (24-0774), Item A.2; RFB2024-3604 Bid Tabulation and CIP · Stuart approves multimillion-dollar dock replacement near Roosevelt Bridge

Put spill reporting in the site contact sheet

For oil or hazardous-material spills, Florida DEP lists the State Watch Office at 800-320-0519 and the National Response Center at 800-424-8802. Keep them with the marina’s incident plan.

Discharge Notification

Show sourcesHide sources
Your next step

Discuss a waterfront business project

Record the affected shoreline and the decision you need to make. Use the notes when discussing scope with the appropriate professional.

Getting your form ready…

Let’s get your project moving.

Tell us what changed at your seawall. We’ll help you work out what to do next.