Help with your seawall project·Port St. Lucie
South Beach, Fort Pierce · Your waterfront project

South Beach (Fort Pierce) waterfront planning

Oceanfront armoring and lagoon seawalls on Fort Pierce South Beach: Jetty Park erosion, 2026 renourishment, CCCL conditional use and city flood rules.

Describe your project on this page ↓
South Beach, Fort Pierce waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.South Beach, Fort PierceCauseway IslandDowntown Fort PierceMoore’s CreekSouth Beach, Fort Pierce waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.South Beach, Fort PierceCauseway IslandDowntown Fort PierceMoore’s Creek
Land: U.S. Census Bureau St. Lucie and Martin county geometry minus Census water features. Points: City of Port St. Lucie GIS, Census places, St. Lucie County GIS and USGS names. Snapshot: October 25, 2026. General reference only; not a survey, flood map or service boundary.

Get to know your waterfront

South Beach is the Fort Pierce portion of South Hutchinson Island, from the inlet south to about latitude 27.433, where unincorporated county land begins. Beaches south of the inlet jetties, built in 1921, erode persistently, and the federal Fort Pierce Shore Protection Project has renourished them 14 times since 1980.

St. Lucie County Municipal Boundaries layer · Florida beach is state's most-eroded, costing $15M every two years (Timothy O'Hara, Apr. 28, 2026) · Fort Pierce Shore Protection Project

Erosion emergencies and armoring

In early 2026 Fort Pierce declared a local beach-erosion emergency; the county placed more than 10,000 cubic yards of stop-gap sand, and the Corps then placed about 400,000 cubic yards under a $15.1 million contract. Offshore T-groins have been proposed as a longer-term fix.

Construction seaward of the CCCL inside city limits needs a city conditional use approval and FDEP approval. East of the CCCL, the lowest horizontal structural member must meet the stricter of the city elevation or DEP’s 100-year storm elevation. Fort Pierce beach erosion fix holding strong ahead of $15 million renourishment project this month · Staff Packet - 324 South Ocean Drive (Conditional Use with New Construction and Design Review, seaward of CCCL) · Floodplain Regulations

What could the work cost?

Oceanfront projects need CCCL, conditional use and turtle-season timing in the schedule; lagoon-side walls follow the normal city route.

Published examples are attributed context from Treasure Coast and nearby South Florida sources, not a Port St. Lucie average or a quote. Your wall needs a property-specific written scope.

Compare quotes and plan a budget →

Find the relevant permits and records

South Beach, Fort Pierce researched starting points
Starting pointWhat to resolvePrepare and look up
Fort Pierce Building Department
Seawall or dock permit with the city’s marine checklist.
Engineering pre-approval, Marine Permit Application, sealed plans, debris affidavit. 772-467-3718.
FDEP Coastal Construction Control Line program
Construction, armoring and excavation seaward of the CCCL on the Atlantic side.
Post-storm cap and tieback repairs need local authorization under an emergency order; replacement needs a CCCL permit. 850-245-8570.
Army Corps, FDEP and SFWMD
Approval letters the city checklist requires.
Flood-zone sites also get a floodplain review; flood questions 772-467-3714.

Prepare the questions for the responsible office.

A South Beach checklist

Use these steps to gather records and prepare a property-specific conversation. Public records and project references do not describe the condition of your wall.

  1. Pull the permit history

    Search the address on the city or county permit portal for seawall, dock and lift permits and their final inspections before the first site visit.

  2. Confirm city or county

    The city line ends near latitude 27.433.

    St. Lucie County Municipal Boundaries layer

  3. Plan the conditional use

    Work seaward of the CCCL needs city conditional use approval.

    Staff Packet - 324 South Ocean Drive (Conditional Use with New Construction and Design Review, seaward of CCCL)

  4. Know the emergency rules

    Temporary armoring must be removed or permitted within 60 days.

    Florida Statutes s. 161.085 - Rigid coastal armoring structures

Start with what you know

Get help with your South Beach, Fort Pierce seawall

Tell us what has changed and how to reach you. We’ll help you work out the next step; photos and measurements can follow later.

Getting your form ready…

South Beach, Fort Pierce project questions

Why does this beach erode so much?

The 1921 inlet jetties changed sand flow; renourishment is needed regularly.

Florida beach is state's most-eroded, costing $15M every two years (Timothy O'Hara, Apr. 28, 2026)

Who funds renourishment?

The 2026 project was about 78% federal and 22% from the county Erosion District.

Fort Pierce beach renourishment project set to begin as erosion threat stabilizes

Keep planning

Nearby waterfront guides

Causeway Island, South Hutchinson Island, Downtown Fort Pierce

View the local guide directory.

Show sourcesHide sources