Help with your seawall project·Port St. Lucie
Riverview · Your waterfront project

Riverview waterways seawall planning

Seawall planning in Port St. Lucie’s Riverview neighborhood: Harborview, Degan and South Coral Reef waterways, dredging records and permits.

Describe your project on this page ↓
Riverview waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.RiverviewRiver ParkNorthport VillageFloresta &Elkcam WaterwayRiver Place &St. Lucie NorthRiverview waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.RiverviewRiver ParkNorthport VillageFloresta &Elkcam Waterway
Land: U.S. Census Bureau St. Lucie and Martin county geometry minus Census water features. Points: City of Port St. Lucie GIS, Census places, St. Lucie County GIS and USGS names. Snapshot: October 25, 2026. General reference only; not a survey, flood map or service boundary.

Get to know your waterfront

Riverview is the city neighborhood along the west bank of the North Fork that holds the Harbor (Harborview), Degan and South Coral Reef waterways, with small portions reaching Floresta Pointe and Lyngate. All three appear on the city’s list of tidal ocean access waterways, whose waterways serve 743 single-family lots in total.

Port St. Lucie Drainage: Canals layer · Ocean Access Waterways – Public Works Department (Waterway Maintenance Presentation)

Short canals with river exposure

Harborview, Degan and South Coral Reef were among the eight waterways dredged in 2010; residents could hire their own contractors to dredge next to banks and docks, removing another 1,924 cubic yards.

Short canals that open onto the river can carry wake and storm energy to the lots nearest the mouth. Ask the inspector to compare walls near the mouth with those at the dead end, and to look for toe scour and cap separation. Ocean Access Waterways – Public Works Department · Port St. Lucie Drainage: Canals layer

What could the work cost?

If several neighbors on one short canal need work, ask for a shared mobilization price; each owner still needs a separate permit.

Published examples are attributed context from Treasure Coast and nearby South Florida sources, not a Port St. Lucie average or a quote. Your wall needs a property-specific written scope.

Compare quotes and plan a budget →

Find the relevant permits and records

Riverview researched starting points
Starting pointWhat to resolvePrepare and look up
Port St. Lucie Building Department
City permit for the seawall (permit type SWL), dock (DK) or boat lift (BL).
Sealed plans, plot plan with setbacks and Notice of Commencement for work of $5,000 or more. 772-871-5132.
FDEP, Army Corps and SFWMD
State exemption or permit, federal authorization and water-management approval the city asks to see.
Show the new wall face relative to the old one (18-inch rule). FDEP Southeast District: 561-681-6600.
Port St. Lucie Public Works
City waterway easements, storm outfalls and encroachment permits.
Signed and sealed survey for a revocable encroachment permit ($125 plus recording). 772-871-5100.

Prepare the questions for the responsible office.

A Riverview waterway checklist

Use these steps to gather records and prepare a property-specific conversation. Public records and project references do not describe the condition of your wall.

  1. Pull the permit history

    Search the address on the city or county permit portal for seawall, dock and lift permits and their final inspections before the first site visit.

  2. Identify the waterway

    Check whether your lot fronts Harbor, Degan or South Coral Reef on the city canal map.

    Port St. Lucie Drainage: Canals layer

  3. Coordinate with neighbors

    Neighboring walls share returns and drainage; see the neighbor-project guide before getting bids.

    Ocean Access Waterways – Public Works Department (Waterway Maintenance Presentation)

  4. Plan around manatee conditions

    In-water work typically carries FWC’s standard manatee conditions, including shutdown if a manatee comes within 50 feet.

    Standard Manatee Conditions for In-Water Work (2011)

Start with what you know

Get help with your Riverview seawall

Tell us what has changed and how to reach you. We’ll help you work out the next step; photos and measurements can follow later.

Getting your form ready…

Riverview project questions

Can I dredge in front of my own wall?

In the 2010 project, residents could hire contractors for areas next to banks and docks. Dredging needs its own permits.

Ocean Access Waterways – Public Works Department

What permits does a repair need?

A city permit, plus the state, federal and water-management approvals the city asks to see. Many restorations within 18 inches are state-exempt.

Building Department Checklist for Dock Permits · Florida Statutes s. 403.813 - Permits issued at district centers; exceptions

Keep planning

Nearby waterfront guides

Floresta & Elkcam Waterway, Northport Village, Westmoreland & Port District, River Park

View the local guide directory.

Show sourcesHide sources